<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet href="http://www.blog.rs/styles/rss.css" type="text/css"?>
<rdf:RDF 
  xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" 
  xmlns="http://my.netscape.com/rdf/simple/0.9/"
>

 <channel>
  <title>uctioncrete</title>
  <link>http://uctioncrete.blog.rs/blog/uctioncrete</link>
  <description></description>
 </channel>
    <item>
   <title>In an attempt to control the air pollution</title>
   <description>&lt;p&gt;With these additional metro train services, for the first time in the history 
of DMRC, Delhi Metro will be running 4,831 trips in a day, the highest ever so 
far.. These additional metro train services have started with effect from 
October 31, 2018, providing 812 additional number of trips.&amp;rsquo; As per forecast by 
the System of Air Quality and Weather Forecasting and Research (Safar), , the 
concentration of pollutants in Delhi&amp;rsquo;s air is set to increase in the next few 
days.The UP government also asked the state&amp;rsquo;s western districts, in and around 
the National Capital Region, to suspend all construction activities between 
November 1 and 10 and shut industries using coal and biomass fuel for a week to 
check pollution. &lt;/p&gt;
&lt;p&gt;The DMRC, keeping in view the worsening of air quality across Delhi and the 
National Capital Region (NCR), has introduced as many as 21 additional number of 
Metro train services on its network. came into force. An AQI between 0 and 50 is 
considered &amp;lsquo;good,&amp;rsquo; 51 and 100 &amp;lsquo;satisfactory,&amp;rsquo; 101 and 200 &amp;lsquo;moderate,&amp;rsquo; 201 and 
300 &amp;lsquo;poor,&amp;rsquo; 301 and 400 &amp;lsquo;very poor,&amp;rsquo; and 401 and 500 as &amp;lsquo;severe.The average air 
quality index (AQI) &lt;a href=&quot;https://www.xtanchor.com/product/mechanical-anchors/wedge-anchor-3.html&quot;&gt;wedge 
anchors Manufacturers&lt;/a&gt; was recorded at 393 on Thursday. From Thursday, all 
construction activities involving excavation and civil construction was ordered 
to be stopped in Delhi and other NCR districts.It includes 14 Metro trains with 
730 trips on newly introduced Shiv Vihar-Trilokpuri-Sanjay Lake section of Pink 
Line.&lt;/p&gt;
&lt;p&gt;In an attempt to control the air pollution level, Delhi Metro Rail 
Corporation (DMRC) is taking a big step.Meanwhile, the air quality in the 
national capital inched very close to the &amp;quot;severe&amp;quot; level on Thursday even as a 
slew of directions like halting of all construction activities involving 
excavation and civil construction, stopping the functioning of all stone 
crushers and hot mix plants generating dust pollution, etc&lt;/p&gt;</description>
   <link>http://uctioncrete.blog.rs/blog/uctioncrete/fixing-anchors-manufacturerswww.xtanchor.com/2019/08/12/in-an-attempt-to-control-the-air-pollution</link>
      <pubDate>, 12  2019 05:28:34 +0200</pubDate>   
  </item>
    <item>
   <title>The general consultants have completed a total</title>
   <description>&lt;p&gt;The commissioner thereafter instructed the contractors to deploy more 
machines to achieve the scheduled completion.There are a bunch &lt;a href=&quot;https://www.xtanchor.com/product/masonry-screws/concrete-bolt-2.html&quot;&gt;concrete 
anchor&lt;/a&gt; of oil pipelines belonging to HPCL, ONGC, BPCL etc.R. The general 
consultants have completed a total 751 boreholes in the marine and land area for 
geotechnical investigation, and 11 per cent of the 2,900m-long temporary bridge 
has been completed so far.4 per cent progress.&lt;/p&gt;
&lt;p&gt;The project, which began in March this year, is being implemented in three 
civil packages.18+187 to CH.613 km long viaduct (from CH.21+800) is showing 5. 
across the MTHL alignment at a chainage around 4.A. Package 3, which involves 
construction of the 3. Package 1, which involves construction of the 10.807 km 
long bridge section is showing 5. According to the officials, nine per cent of 
the project has been completed so far.5km from Sewri.During the visit, the 
metropolitan commissioner launched Reverse Circulation Drilling Rigs (RCDs) at 
the intertidal zone that are imported from Germany for speedy construction work 
in the marine area.&lt;/p&gt;
&lt;p&gt;Package 2, which involves construction of the 7.380 km long bridge section is 
showing 12.The MTHL touches land at Shivajinagar on the Navi Mumbai side and the 
commissioner visited the casting yard of package 2 and the ongoing construction 
work of the 2,100m long temporary bridge. Rajeev, metropolitan commissioner, 
MMRDA, visited the MTHL site and noted overall nine per cent progress of the 
project that will provide easy connectivity between the island city and the 
mainland. The physical identification of pipelines at two locations in packages 
1 and 2 by sending divers up to the seabed was in progress in the presence of 
the representatives of stakeholders.Mumbai: MMRDA officials on Sunday visited 
the MTHL (Mumbai Trans-Harbour Link) construction site to check on the ongoing 
work of the Sewri-Nhava Sheva connector.37 per cent progress.28 per cent 
progress. The project is expected to be completed by September 2022&lt;/p&gt;</description>
   <link>http://uctioncrete.blog.rs/blog/uctioncrete/fixing-anchors-manufacturerswww.xtanchor.com/2019/08/07/the-general-consultants-have-completed-a-total</link>
      <pubDate>, 07  2019 04:57:15 +0200</pubDate>   
  </item>
  </rdf:RDF>

